October 14, 2021 Release Notes
Enable Requirement Planning to Utilize Dynamic Lead Time in Single Location Business Nodes
Requirement Planning has been enhanced to utilize Dynamic Lead Time functionality in business nodes that are configured to be single-location. Previously Dynamic Lead Time was only capable of being used in multi-location business nodes. With this enhancement the use of Dynamic Lead Time will be possible in both multi-location and single-location business nodes.
0 Comments
Add your comment